Installation requirements

Before you request a connection here is a helpful guide to understand what we need to process your request.

  • Properties with a single connection

    If you choose to appoint an approved plumber or groundworker, we will require the following information:

    1. A copy of the approved contractor certificate (WIAPS or equivalent).
    2. A photo which shows that the pipework has been laid to the agreed point at boundary as per your survey drawing. example photo

    If you choose not to use an approved groundworker or plumber to install your pipework, we will require a few more photos in order to ensure that your site is ready for connection:

    • Laid your pipe at a depth of 750 – 850mm. You will need to show us the finished ground level with respect to the depth of the pipe. example photo
    • You have capped the end of the pipe at the boundary to prevent contamination. The cap should be visible in the boundary photo but you can take a close up photo if you like.example photo
    • You have installed a stop tap internally. example photo
    • You have added ducting/insulation through/under the wall example photo

    View our ‘Are you ready for connection?’ document.

  • Properties with multiple connections

    If you choose to appoint an approved plumber or groundworker, we will require the following information:

    1. A copy of the approved contractor certificate (WIAPS or equivalent).
    2. A photo which shows that the pipework has been laid to the agreed point at boundary as per your survey drawing.example photo
    3. A photo which shows all of the new services marked up with the address or plot number of the property to which the water is being supplied.example photo

    If you choose not to use an approved groundworker or plumber to install your pipework, we will require a few more photos in order to ensure that your site is ready for connection:

    • Laid your pipes at a depth of 750 – 850mm. You need to show the finished ground level with respect to the depth of the pipes. example photo
    • Your pipes are the correct material (standard or barrier). example photo
    • You have taken your pipes to the edge of the highways boundary (this includes crossing any third party land between your property boundary and the highway boundary).  example photo
    • You have capped the end of the pipes at the boundary to prevent contamination. The cap should be visible in the boundary photo but you can take a close up photo if you like.example photo
    • You have installed stop taps internally. This might be in one location or in individual properties. example photo
    • You have added ducting/insulation through/under the wall example photo

    View our ‘Are you ready for connection – multiple connections?’ document.

  • Properties with a bulk supply and internal meters

    If you choose to appoint an approved plumber or groundworker, we will require the following information:

    1. A copy of the approved contractor certificate (WIAPS or equivalent).
    2. A photo which shows that the pipework has been laid to the agreed point at boundary as per your survey drawing.example photo

    If you choose not to use an approved groundworker or plumber to install your pipework, we will require a few more photos in order to ensure that your site is ready for connection:

    For a properties with bulk supply and internal meters, you need to show us you have example photos and/ or WIAPS certificate. See below for examples of the photos we require.

    • Laid your pipe at a depth of 750 – 850mm. You need to show the finished ground level with respect to the depth of the pipe. example photo
    • Your pipe is the correct material (standard or barrier) example photo
    • You have taken your pipe to the edge of the highways boundary (this includes crossing any third party land between your property boundary and the highway boundary) example photo and/or WIAPS Certificate
    • You have capped the end of the pipe at the boundary to prevent contamination. The cap should be visible in the boundary photo but you can take a close up photo if you like. example photo
    • You have installed and internal manifold arrangement (1.5inch BSP labelled internal meter carriers) as per our design specification and the meter housings have been installed.
    • You have added ducting/insulation through/under the wall example photo

    View our ‘Are you ready for connection – bulk supplies?’ document.

Guidelines on laying utilities in the same trench
Please upload your photographs to My Developments